VLQ Quantum Computer – Planned Maintenance and Downtime (7–25 September 2026) - 7.9. 00:00 - 25.9.2026 23:59
Planned maintenance 4-25.9 2026
Replacement of pulse lines
Warmup: 4th September 2026 Maintenance: 7th September Cooldown and Calibration: 8–25th September
From 17th September, VLQ is accessible with provisional, less accurate calibration. The calibration is still ongoing, this may cause longer queing times.